What Counts As Plumbing Installation
Bathroom additions
New supply, drain and vent lines for a toilet, sink and shower or tub.
Kitchen remodels
Relocating sinks, adding dishwasher lines and gas or water for appliances.
Basement finishing
Rough-in for a bathroom or wet bar, sometimes needing a sewage ejector.
Fixture upgrades
New toilets, faucets, showers and water heaters connected to existing lines.
Planning A Basement Bathroom
A basement bathroom below the sewer line needs special planning. Wastewater cannot flow uphill, so the plumber may install a sewage ejector pit and pump. The pit is sealed and vented, and the pump sends waste up to the main.
Check the slab and the soils too. Colorado's expansive clay soils can heave a slab, and the Colorado Geological Survey publishes a swelling soils guide that builders give to new-home buyers. Ask the plumber how the lines are supported so movement does not strain them.
Code, Venting And Slope
| Item | Why it matters | What we check |
|---|---|---|
| Drain slope | Waste must flow without pooling | Quarter inch per foot on most small drains |
| Venting | Lets air in so traps do not siphon | Vent size and distance to each trap |
| Trap and cleanout access | Allows future clearing | A cleanout at the right place |
| Supply sizing | Keeps pressure at the fixtures | Pipe diameter and run length |
| Backflow protection | Protects the water supply | Air gaps and approved devices |
The International Plumbing Code is the base for most local rules, and the local authority adopts and amends it. In Erie, the Town Building Division at 303-926-2780 handles permits. We confirm requirements before work starts.
From Rough-In To Final
Plan and permit
We review drawings, confirm fixture locations and apply for the permit.
Rough-in
Supply, drain and vent lines go in before walls close, then the inspector checks them.
Set fixtures
After finish work, toilets, sinks, showers and faucets are installed.
Final inspection
The inspector signs off, and we test every fixture.
Working With Other Trades
Plumbing sits in the middle of a remodel. Framers need to know where drains and vents will pass through joists. Electricians need to know where a water heater, disposal or pump will draw power. Drywall and tile crews come after the rough-in inspection.
Share the plans early and ask the plumber to mark fixture locations on the framing. A fifteen-minute walk-through before drywall is hung avoids most surprises.
Questions to ask any plumber before hiring
- Is the person doing the work licensed, and for which contractor
- Who pulls the permit and schedules the inspections
- What is included in the written price and what would change it
- How are surprises handled once a wall is opened
- Who handles drywall, tile and paint after the plumbing is done
You can verify a plumber's license on the State Plumbing Board's licensee lookup.
Pressure and venting are code items on any new work. The International Plumbing Code (IPC) calls for a pressure reducing valve when static pressure exceeds 80 psi and sets vent and trap rules for every fixture. The plumber confirms both with the inspector at rough-in.
What drives the price
Installation pricing depends on scope and access. You get a written price before any work starts.
If an inspection requires a change, the plumber explains it and the cost before continuing.
Want your real number? Call (303) 552-3896 and describe the job.
Planning A Remodel With New Plumbing?
Call the Erie line and tell us what you are building. We will walk the space with you.
Backflow And Water Quality
Outdoor spigots, irrigation systems and some fixtures need backflow protection to keep contaminated water from reaching the supply. A hose bib vacuum breaker is a simple version. Irrigation systems and certain commercial uses need an assembly that is tested.
If you are adding a softener or filter at the same time, see water softener and filtration. For a new water heater, see water heater installation. For a problem with an existing drain, start with drain cleaning.
We also work in Lafayette. See the Lafayette page.
Installation and remodel plumbing covers ZIP 80516 and the towns of 80026, 80027, 80530 and 80514, in both Weld and Boulder counties. Permits and inspections run through the Town of Erie Building Division at 303-926-2780 for Erie addresses, and we ask the local office for the other towns.
Plumbing Installation Questions
Almost certainly. Plumbing additions need permits and inspections from the local authority. Call the Erie Building Division at 303-926-2780.
Usually yes. The plumber checks the sewer depth and decides whether a sewage ejector is needed.
At the planning stage, before framing. Fixture locations affect framing and venting.
You can supply them or ask the plumber to source them. Bring fixture specs early so the rough-in is correct.
